In this video we explain 3 phase kwh meter connection with ct operated basically this type of kwh meter is use for ratting ratting load because to direct me.
Three phase ct energy meter connection diagram.
Meter installation manual hxe310 10 18 fig 5 2 ct pt connection 6 dimension.
Below is the connection of 3 phase three phase or poly phase 3 phase 4 wire kwh meter digital or analog energy meter from the supply to the main distribution board.
Three current transformer installation with ammeters for three phase supply the connection of ct is to easy and the best place of installation of ct in electric power panel board is to connect it with incoming supply wires and connection.
The meter which is used for measuring the energy utilises by the electric load is known as the energy meter.
The energy meter wiring connection is same as i shown in the diagram.
Markings on the meter and the ct 6 always connect k or s1 to the first terminal of the phase and l or s2 to the third terminal.
Three phase energy meter for hxe310 ct ctpt meter hexing electrical co ltd.
The meter is less expensive and accurate.
3 phase supply standard connection for 230 400v 4 wire ct meter installation and test block pdf 0 27 mb 3 phase supply with 1 controlled phase pdf 0 21 mb 3 phase supply with 2 24 hour phases and one controller phase for distributed generation pdf 0 11 mb.
If the 4 core electric cable is not available you can also use the single core cables or double.
The energy is the total power consumed and utilised by the load at a particular interval of time it is used in domestic and industrial ac circuit for measuring the power consumption.
The rated voltage is 3 57 7 3 230v and the.
The meter is for lv or hv three phase user.